As the project progresses, many changes occur in project data. Then the original baseline project that you have created may not accurately measure performance against the current project. And you cannot create a new baseline to measure the accurate results as some data
Some of the changes may occur like:changed during the life of the project.
  • Drop/Addition of activities
  • Modified dates, costs, resources, steps, documents, relationships, notebooks, documents, codes etc.
  • Modified Details, documents, risks, thresholds, calendars, codes
Using the Update Baseline feature, you can update the original baseline plan with new project updated data, while updating you can choose the fields that you want to update or you can apply a filter to update activities that meet the filter’s criteria.

How to update a baseline?

Open the project whose baseline you would like to update, Go to Menu bar, choose Project, and maintain baselines.













In the Maintain baseline dialog box, select the baseline and click on “Update” button

Select the project level data you want to update from this window by checking the check boxes. Choose to update all activities or select a filter to only update activities that meet the filter’s criteria. Choose to add new activities from this current project, delete activities that are no longer valid for the current project.

And you can update existing activities, clicking Update Options to select the types of activity and resource/role assignment data you want to update.

To save the results of the baseline update to a file, enter a path or select a file under log to file. After selecting required options, finally click Update. When the update is complete, you can view the results by clicking View Log. The PM module stores the date on which the baseline was last updated, you can view the Last update date field in the Maintain Baselines dialog box.

Here is the detailed video tutorial for your better understanding:

[paypal_donation_button align="center"]

Comments

Popular posts from this blog

How To Merge Two Separate Schedules Into One Master Schedule In Primavera

In this tutorial, let us learn how to Merge two separate schedules into One Master schedule in Primavera P6. In this example, I am considering two separate projects which are these two, One is master schedule and one is the subproject. First, let us open the subproject and export this schedule as a .XER file onto Desktop. and now let us start the exact process of merging two separate schedules. 1. As a first step, We need to open the project schedule into which we want to insert the other project as a sub-project. So, let us open the Master schedule here. 2. Go to Import, select XER format, Click Next 3. Select Project and click Next 4. Now select the Subproject .xer file from the Desktop and click Next 5. Under Import action, select the option as “Update Existing Project” and under import to section, select the Master schedule which is already open. Click Next and Finally Click on Finish. 6. Please note and make sure that your WBS and activity IDs should not confl...

Primavera P6 Export To Excel And Color WBS Levels Automatically || How To Color WBS Levels

In this tutorial, let us learn how to Color WBS levels after Primavera P6 Export To Excel. After exporting activity table from Primavera P6 to Excel, it’s very hard to tell which activity belong to which WBS. So in this tutorial, let us see how to color WBS levels automatically so we can have a report like in Primavera P6. This is my sample schedule in primavera, 1. I press Ctrl+A to select entire data and copy the data and then go to Excel sheet and paste it. 2. Add a column left to Activity Id i.e column A and name it as WBS level to show the WBS level for each activity. 3. enter the formula in Cell A2 as = =((FIND(TRIM(B2),B2))-1)/2 4. Hit enter and then apply the same formula to all the cells in column A to see WBS level for each activity. 5. See now, you can view the WBS level for each activity this way easily in Excel after exporting the Primavera P6 Schedule. And Now let us color the WBS levels. 1. Select the entire Data range. 2. Go to Conditional F...

Primavera P6 Tutorial : Chapter 2.7 : User Defined Fields

Apart from the in-built fields available in primavera, you can create User-defined fields which enable you to customize fields and values and add them to the project database. For example, you can use them to track additional activity data such as ordered dates, delivery dates, revised budgets, purchase order / work order numbers, vendor names, etc. In this chapter, let us learn how to create User defined fields, how to work with them and how to work with indicators type of User defined fields. How to Create UDFs? For each custom user defined field you create, you can specify any of the following data formats for that field: Text, Start Date, Finish Date, Cost, Integer, Number, Text, and Indicator. To Define: Go to the Menu bar, Choose Enterprise, select  User Defined Fields . Select the subject area to which you want to add a new field, then click  Add . Double-click in the Title column and type a name for the User Defined Field. Double-click in the Da...