Use Of Flash Fill To Quickly Combine And Separate Column Data In MS Excel | Excel Tips | dptutorials





·         Flash fill is the most powerful tool that has been introduced in MS Excel 2013. Using this feature, we can combine multiple columns and separate the data from a column. Now let’s see with an example.
·         In the first column, I have Full names (First name separated by last name) and if I would like to reverse the order of first name and last name, we generally do that by using the Text to columns / concatenate functions. But using this new feature of flash fill, we don’t’ need to do this anymore.
·         In the adjacent column, I type the last name of the first entry, comma and type the first name and then go to the menu bar and go to the Data tab and click on flash fil (either u can press Ctl+E as a shortcut) and you will notice that the names populated as per your wish. It’s nice right.
·         In the 2nd example, let’s try combining the two columns. Now we have first name and last name in two separate columns and lets start by typing the first entry with last name , comma and first name and press Ctrl +E to flash fill the values.
·         In the 3rd example, let’s see how to separate the single column into multiple columns. In this column we have the City name, State Short name and pincode and let’s try to separate them in to three columns. For the first entry I type the city, state name and pincode in three columns separately and selecting these 3 cells together, when I go to the Flash fill feature in the data tab, you will notice that the feature is in inactive mode, but when you click on only first cell you can operate the flash fill now, repeat this for next two columns. It’s done right. You can even adjust the text formats using this flash fill feature.



For Personalized detail learning, write to dptutorials15@gmail.com

If you found this video valuable, give it a like. If you know someone who needs to see it, share it. Leave a comment below with your thoughts. Add it to a playlist if you want to watch it later.


***************************************************************
Read my full article on this: http://ift.tt/2kB14dh

***************************************************************
Subscribe for more Awesome Tutorials: goo.gl/4T8ePc

***************************************************************
Support The Channel via shopping: http://ift.tt/2jH38PR

**************************************************************

You Can Connect With Me at
G+ : http://ift.tt/2kAOpa6
Twitter : https://twitter.com/dptutorials15
Facebook : http://ift.tt/2kfRnDi
Blogspot : http://ift.tt/2kB14dh

Comments

Popular posts from this blog

Primavera P6 Tutorial : Chapter 2.7 : User Defined Fields

Apart from the in-built fields available in primavera, you can create User-defined fields which enable you to customize fields and values and add them to the project database. For example, you can use them to track additional activity data such as ordered dates, delivery dates, revised budgets, purchase order / work order numbers, vendor names, etc. In this chapter, let us learn how to create User defined fields, how to work with them and how to work with indicators type of User defined fields. How to Create UDFs? For each custom user defined field you create, you can specify any of the following data formats for that field: Text, Start Date, Finish Date, Cost, Integer, Number, Text, and Indicator. To Define: Go to the Menu bar, Choose Enterprise, select  User Defined Fields . Select the subject area to which you want to add a new field, then click  Add . Double-click in the Title column and type a name for the User Defined Field. Double-click in the Da...

Exporting the Primavera data into excel with same color formatting.

In the earlier posts, we have already seen  how to export the primavera schedule into the excel format and then do the  modifications for further usage. Now, let us see how the schedule in excel looks similar to that of the schedule in the primavera. Here are the steps for the same: Step-1: Open the project in the primavera p6. Step-2: Now, the sample schedule in primavera looks like this as shown below Step-3: Now Press Ctrl+A to select all the rows and columns in the primavera schedule  and C opy all the selected data Step-4: Now go to an excel sheet and right click and select "Paste" option to paste the data that has been copied from the primavera screen Step-5: Insert a user defined column "Level" for filtering purpose and apply filters to all the data. and then filter the Column "Activity name" by checking the "Blanks" -This is nothing but we are filtering all the WBS rows and excluding the activities. ...

Top 4 Useful Features, Tricks You Can Use In Primavera P6 || Special features To Learn In Primavera

1. How to Increase the size of icons in Primavera P6?  If you find that the menu bar and command icons are of less visibility, there is a way to increase the size of icons in Primavera P6. Let us see how to do this in this tutorial now. Go to the menu bar and under the view tab, select Toolbars and click on customize. Now a window gets opened like this, go to options tab and tick the checkbox "Large Icons". Click on the Close button and you can see that all your icons now increased in size. 2. How to Animate your Menu Bars in Primavera P6? You know that we have got the option to animate menu bars in Primavera P6. There are 4 animation options in Primavera P6, These are None  Random  Unfold Slide  Fade  You can try any of these if you want a new feel. Follow this steps to Animate Menu Bars. Click on View, go to toolbars, select Customize. Now a customize window will pop up. Go to the options tab, at Menu Animat...