Top 4 Useful Features, Tricks You Can Use In Primavera P6 || Special features To Learn In Primavera



1. How to Increase the size of icons in Primavera P6? 

If you find that the menu bar and command icons are of less visibility, there is a way to increase the size of icons in Primavera P6.

Let us see how to do this in this tutorial now.

Go to the menu bar and under the view tab, select Toolbars and click on customize.

Now a window gets opened like this, go to options tab and tick the checkbox "Large Icons".

Click on the Close button and you can see that all your icons now increased in size.

2. How to Animate your Menu Bars in Primavera P6?

You know that we have got the option to animate menu bars in Primavera P6.

There are 4 animation options in Primavera P6,

These are

  • None 
  • Random 
  • Unfold Slide 
  • Fade 


You can try any of these if you want a new feel. Follow this steps to Animate Menu Bars.

Click on View, go to toolbars, select Customize.

Now a customize window will pop up.

Go to the options tab, at Menu Animations:

Check on Drop Down Button and select any of these options, let me select random and click the Close button. then click on any of the menu bars FILE or EDIT

3. How to Fix Messed up Toolbar in Primavera P6.?

If your menu bar and icons got disturbed and their positions got changed, or your toolbars got messed up completely.

you need to watch this video tutorial to know how to fix messed up a toolbar in Primavera P6.

Go to View tab, click on Reset all toolbars
Now you will get a window popping up. click on YES, and then you can see toolbar getting into its original position you know, we can Lock your toolbar Icons in Primavera P6, so to avoid the messing up in future.

Go to View tab, Click on Lock all toolbars


4. How to Stack Multiple windows in one screen in Primavera P6?

If you would like to see multiple windows in one screen in Primavera P6, we have got this option in primavera p6, We have got three options of stacking windows in Primavera P6.

They are:

  • New Horizontal Tab Group (For Horizontal stacking of windows) 
  • New Vertical Tab Group (For Vertical stacking of windows) 
  • Merge all Tab Group (Default Option) 


Now let us see how to do this. First, open a project, then click on WBS Click on Activity Tab, then go to the View tab, select tab groups, click on New vertical tab group. Whichever tab you click, that tab will be stacked Vertically


For Personalized detail learning, write to dptutorials15@gmail.com If you found this video valuable, give it a like. If you know someone who needs to see it, share it. Leave a comment below with your thoughts. Add it to a playlist if you want to watch it later.

***************************************************************
Read my full article on this: http://ift.tt/2kB14dh
***************************************************************
Subscribe for more Awesome Tutorials: goo.gl/4T8ePc
***************************************************************
Support The Channel via shopping: http://ift.tt/2jH38PR
**************************************************************

You Can Connect With Me at
G+ : http://ift.tt/2kAOpa6
Twitter : https://twitter.com/dptutorials15
Facebook : http://ift.tt/2kfRnDi
Blogspot : http://ift.tt/2kB14dh

Comments

  1. THANKS FOR SHARING SUCH A AMAZING CONTENT
    GREAT PIECE OF WORK!!!
    REALLY APPRECIATE YOUR WORK!!!
    Project Management USA

    ReplyDelete
  2. youtube
    youtube.com youtube channel youtube channel youtube channel youtube channel youtube channel youtube channel septcasino youtube channel youtube channel youtube channel youtube channel youtube channel youtube channel youtube  youtube channel youtube channel youtube channel youtube channel youtube channel youtube channel youtube youtube mp3 channel youtube videodl channel youtube channel youtube channel youtube channel youtube channel youtube channel

    ReplyDelete

  3. The primavera training in karachi stands as a premier training program designed to equip individuals with comprehensive skills in project management and planning using Primavera software.

    ReplyDelete

Post a Comment

Popular posts from this blog

How To Merge Two Separate Schedules Into One Master Schedule In Primavera

In this tutorial, let us learn how to Merge two separate schedules into One Master schedule in Primavera P6. In this example, I am considering two separate projects which are these two, One is master schedule and one is the subproject. First, let us open the subproject and export this schedule as a .XER file onto Desktop. and now let us start the exact process of merging two separate schedules. 1. As a first step, We need to open the project schedule into which we want to insert the other project as a sub-project. So, let us open the Master schedule here. 2. Go to Import, select XER format, Click Next 3. Select Project and click Next 4. Now select the Subproject .xer file from the Desktop and click Next 5. Under Import action, select the option as “Update Existing Project” and under import to section, select the Master schedule which is already open. Click Next and Finally Click on Finish. 6. Please note and make sure that your WBS and activity IDs should not confl...

Primavera P6 Export To Excel And Color WBS Levels Automatically || How To Color WBS Levels

In this tutorial, let us learn how to Color WBS levels after Primavera P6 Export To Excel. After exporting activity table from Primavera P6 to Excel, it’s very hard to tell which activity belong to which WBS. So in this tutorial, let us see how to color WBS levels automatically so we can have a report like in Primavera P6. This is my sample schedule in primavera, 1. I press Ctrl+A to select entire data and copy the data and then go to Excel sheet and paste it. 2. Add a column left to Activity Id i.e column A and name it as WBS level to show the WBS level for each activity. 3. enter the formula in Cell A2 as = =((FIND(TRIM(B2),B2))-1)/2 4. Hit enter and then apply the same formula to all the cells in column A to see WBS level for each activity. 5. See now, you can view the WBS level for each activity this way easily in Excel after exporting the Primavera P6 Schedule. And Now let us color the WBS levels. 1. Select the entire Data range. 2. Go to Conditional F...

Primavera P6 Tutorial : Chapter 2.7 : User Defined Fields

Apart from the in-built fields available in primavera, you can create User-defined fields which enable you to customize fields and values and add them to the project database. For example, you can use them to track additional activity data such as ordered dates, delivery dates, revised budgets, purchase order / work order numbers, vendor names, etc. In this chapter, let us learn how to create User defined fields, how to work with them and how to work with indicators type of User defined fields. How to Create UDFs? For each custom user defined field you create, you can specify any of the following data formats for that field: Text, Start Date, Finish Date, Cost, Integer, Number, Text, and Indicator. To Define: Go to the Menu bar, Choose Enterprise, select  User Defined Fields . Select the subject area to which you want to add a new field, then click  Add . Double-click in the Title column and type a name for the User Defined Field. Double-click in the Da...